Tuesday 08-12-09

August 4th - Pulled up the tile glued these back down the same day
P8040015.JPG
P8040015.JPG
(1.29MB)
P8040016.JPG
P8040016.JPG
(1.41MB)
P8040017.JPG
P8040017.JPG
(1.06MB)
P8040018.JPG
P8040018.JPG
(1.02MB)
P8040019.JPG
P8040019.JPG
(1.33MB)
P8040020.JPG
P8040020.JPG
(1.34MB)

August 5th - Pulled up the tile and glued these back down the same day.
P8050021.JPG
P8050021.JPG
(1.06MB)
P8050022.JPG
P8050022.JPG
(1.33MB)
P8050023.JPG
P8050023.JPG
(1.31MB)
P8050024.JPG
P8050024.JPG
(1.25MB)
P8050025.JPG
P8050025.JPG
(1.23MB)
P8050026.JPG
P8050026.JPG
(1.01MB)
P8050027.JPG
P8050027.JPG
(1.35MB)
   

August 6th - Pulled up these tile and glued them back down.  Installed the backing for the hand holds for the shower.  The 2x4's go down about 4 inches above and below the hand hold mounts.  Installed the wall tile on the west side of the bathroom as well.
  P8060028.JPG
P8060028.JPG
(1.37MB)
P8060029.JPG
P8060029.JPG
(1MB)
P8060030.JPG
P8060030.JPG
(1.04MB)
P8060031.JPG
P8060031.JPG
(1.33MB)
P8060032.JPG
P8060032.JPG
(1.36MB)
P8060033.JPG
P8060033.JPG
(1.05MB)
P8060034.JPG
P8060034.JPG
(0.999MB)
P8060035.JPG
P8060035.JPG
(1.18MB)
P8060036.JPG
P8060036.JPG
(1.33MB)
P8060037.JPG
P8060037.JPG
(1.37MB)
P8060038.JPG
P8060038.JPG
(1.22MB)
P8060039.JPG
P8060039.JPG
(1.37MB)
P8060040.JPG
P8060040.JPG
(1.29MB)
P8060041.JPG
P8060041.JPG
(1.17MB)

August 7th - Installed the wall tile on the East side of the bathroom.  Installed the white tile on the shower surround.
P8070042.JPG
P8070042.JPG
(1.11MB)
P8070043.JPG
P8070043.JPG
(1.03MB)
P8070044.JPG
P8070044.JPG
(1.3MB)
P8070045.JPG
P8070045.JPG
(1.19MB)
P8070046.JPG
P8070046.JPG
(1.32MB)
P8070047.JPG
P8070047.JPG
(1.35MB)
P8070048.JPG
P8070048.JPG
(1.03MB)
P8070049.JPG
P8070049.JPG
(0.99MB)
P8070050.JPG
P8070050.JPG
(1.01MB)

August 8th - Grouted the floor and the wall trim on the West side of the bathroom.
August 10th - Grouted the wall trim on the East side of the bathroom and then did a skim coat on the whole floor and the West side of the bathroom.
August 11th - Cleaned the floor and put back most of the wall decorations and removed the extra slats from the window blinds.

August 12th - Sealed the grout and the final result.
P8120051.JPG
P8120051.JPG
(1MB)
P8120052.JPG
P8120052.JPG
(1.01MB)
P8120053.JPG
P8120053.JPG
(1.01MB)
P8120054.JPG
P8120054.JPG
(1.34MB)
P8120055.JPG
P8120055.JPG
(1.25MB)
P8120056.JPG
P8120056.JPG
(972KB)
P8120057.JPG
P8120057.JPG
(1.04MB)
P8120058.JPG
P8120058.JPG
(1.04MB)
P8120059.JPG
P8120059.JPG
(1.35MB)
P8120060.JPG
P8120060.JPG
(1.06MB)
P8120061.JPG
P8120061.JPG
(1.05MB)
P8120062.JPG
P8120062.JPG
(1.37MB)
P8120063.JPG
P8120063.JPG
(1.39MB)
P8120064.JPG
P8120064.JPG
(998KB)
P8120065.JPG
P8120065.JPG
(1.34MB)