04-08-07

Today, I rented a trencher and trenched everything for the sprinkler system.  I was on it for just over 9 hours of clock time on the meter.  Amy moved flags, measured depth, and put boards across the trenches so I could drive across them.  We were both worn out at the end of the day.

I missed the phone line by about 8 inches.  Crashed the trencher into the trench once. 

These are basic pictures.  I'll take detailed ones once everything is dug so we have records of the pipe locations for the future if we have a problem.

 

P4080037.JPG
P4080037.JPG
(1.06MB)
P4080038.JPG
P4080038.JPG
(0.999MB)
P4080039.JPG
P4080039.JPG
(1.18MB)
P4080040.JPG
P4080040.JPG
(1.23MB)
P4080041.JPG
P4080041.JPG
(1.32MB)
P4080042.JPG
P4080042.JPG
(1.15MB)
P4080043.JPG
P4080043.JPG
(1.25MB)
P4080044.JPG
P4080044.JPG
(1.13MB)
P4080045.JPG
P4080045.JPG
(1MB)
P4080046.JPG
P4080046.JPG
(1.06MB)
P4080047.JPG
P4080047.JPG
(1.15MB)
P4080048.JPG
P4080048.JPG
(1.15MB)
P4080049.JPG
P4080049.JPG
(1.28MB)
P4080050.JPG
P4080050.JPG
(0.989MB)
P4080051.JPG
P4080051.JPG
(1.3MB)
P4080052.JPG
P4080052.JPG
(1.06MB)
P4080053.JPG
P4080053.JPG
(1.16MB)
P4080054.JPG
P4080054.JPG
(1.23MB)
P4080055.JPG
P4080055.JPG
(1.25MB)
P4080056.JPG
P4080056.JPG
(1.27MB)
P4080057.JPG
P4080057.JPG
(1.11MB)