Today, I rented a trencher and trenched everything for the sprinkler
system. I was on it for just over 9 hours of clock time on the
meter. Amy moved flags, measured depth, and put boards across the
trenches so I could drive across them. We were both worn out at
the end of the day. I missed the phone line by about 8 inches. Crashed the trencher into the trench once. These are basic pictures. I'll take detailed ones once everything is dug so we have records of the pipe locations for the future if we have a problem. |