Friday  07-07-06

Monday morning I did a majority of the forming of the patio in the back by the mound.  It is 24 feet in diameter with a 4 foot diameter opening in the center.  I used some stuff that is 12"x16'x1/2" thick masonite stuff that I cut into 4 inch strips and bent it around the circle.

Tuesday was the 4th of July so no work.  Wednesday it rained, so no work.

Thursday I ordered pea gravel and back filled in the patio and Amy helped. 

Today I finished things up and got all the rebar finished.  We poured 6 yards of concrete at 4pm.  It didn't turn out to bad, but it cured pretty dang fast.

We had to use the forklift to get me out of the center and to help broom the surface.  About 9pm I took my shop broom and scrubbed the surface to smooth it up a bit and then used the leaf blower to clean it off. 

 

P7070001.JPG
P7070001.JPG
(0.988MB)
P7070002.JPG
P7070002.JPG
(1.04MB)
P7070003.JPG
P7070003.JPG
(1.06MB)
P7070004.JPG
P7070004.JPG
(1.05MB)
P7070005.JPG
P7070005.JPG
(1.27MB)
P7070006.JPG
P7070006.JPG
(1.2MB)
P7070007.JPG
P7070007.JPG
(1.06MB)
P7070008.JPG
P7070008.JPG
(1.08MB)
P7070009.JPG
P7070009.JPG
(1.16MB)
P7070010.JPG
P7070010.JPG
(1.1MB)
P7070011.JPG
P7070011.JPG
(1.19MB)
P7070012.JPG
P7070012.JPG
(1.16MB)
P7070013.JPG
P7070013.JPG
(1.08MB)
P7070014.JPG
P7070014.JPG
(1.22MB)
P7070015.JPG
P7070015.JPG
(1.03MB)
P7070016.JPG
P7070016.JPG
(1.29MB)
P7070017.JPG
P7070017.JPG
(1.01MB)
P7070018.JPG
P7070018.JPG
(1.32MB)
P7070019.JPG
P7070019.JPG
(1.36MB)
P7070020.JPG
P7070020.JPG
(1.32MB)
P7070021.JPG
P7070021.JPG
(1.4MB)
P7070022.JPG
P7070022.JPG
(1.34MB)
P7070023.JPG
P7070023.JPG
(1.25MB)
P7070024.JPG
P7070024.JPG
(1.23MB)
P7070025.JPG
P7070025.JPG
(1.09MB)
P7070026.JPG
P7070026.JPG
(1.19MB)

This page was generated by an unregistered version of Pink Mouse's Image Organiser