This morning I had quite a few visitors and didn't get much
done for the first hour or so. We got started upstairs and got the header area above the door to the computer room framed in, and built in the truss area in the game room where the double trusses were along with putting in the access port into that section of the attic. Sheetrock blocks are finished as well. I finished the lights in there as well. We moved over to the stairway area and had to put OSB on the back section to make level it up a bit and give the sheetrockers better backing to screw to. In the home theater we fixed the wall that was three inches off. We bought another roll of wire. Dad got there and we finished hooking up the sub-panel box. I wired the neutrals wrong and had to fix that. We poured some concrete in Matts pillar in the front that John gave us for free. We ran short a bit and had to go shovel it out of the other Johns hole since his form blew out. I ran a power lead to the front lights. Most of the rest of the night we spent going over the wiring making sure it was nailed down since the inspector will be here tomorrow. |