This morning when I got to the house Jeff's kids were there
trying to find a leak in the system. One leak was a loose fitting on
the bathroom bathtub, the other was a leak in their gauge. I tidied up the house and Kelly and Lexy came over. Kelly went home for a bit and Lexy stayed. She helped me pick up trash and she built a castle out of electrical boxes. We then had a pop from my little fridge that she thought was cool. After she left, I started work in the computer room with network boxes. I put the smurf pipe in where I thought it should go and then put the boxes in. I glued the piping to the studs. I also drilled 4 holes in the floor for the East side of the computer rooms smurf pipe to route into the crawlspace. I went to lunch and bought duct work for the upstairs future air conditioning and grommets. After lunch I didn't get much work done. Tom came over and we figured his bill out and then he wanted to talk for a while as usual. After that I worked on lights in the computer room. It was a pain to get them figured out so things looked ok. At about that time dad showed up. He started putting grommets in heaters. After that, he put in the electrical wiring for the lights in the garage and cleaned the garage a bit. We then finished the sheetrock blocks in the computer room on the South wall. I relocated the thermostat box earlier in the day. Dad cleaned the upstairs and I went to the Home Theater to adjust the sconces a bit since they were a bit off. I still am not sure what to do about the spotlights I want in the room. In the game room, two trusses are exactly in the way of making the can lights not work right, so I gave up on that for the day. I went back to the home theater and worked on running conduit into the crawlspace. We left at 10pm. I then worked on a circuit breaker layout for the two panel boxes. |