Today Matt had to work in the morning, so I went out and
cleaned the family room and installed the sconce boxes on both sides of the
entertainment center. I also put up my network boxes throughout the
house. I went to Franklin to get 2x8's to build the wall in the room above the garage. Matt got off work and Dad then showed up. We built a box for the window to go in, then framed around the box. I will take pictures on the inside of the room tomorrow. We put the osb on the outside, then put the window in and then finished the osb on the corners. The shinglers worked most of the morning till mid afternoon, then left and came back at about 6:30 and worked till about 9:30. They got the East side done, and started papering above the master bedroom. |