No pictures today, it was to dark. Today I started the day by cleaning up some stuff laying around while Matt took the girls to Moms to babysit. I put the sliding door in the dining room door. We didn't put it in yesterday when we put the frame in. When Matt got there, we installed the sliding glass door in the family room and put the windows in my bathroom. After that, we started working on the patio cover. We dropped the vault down so it isn't so tall inside. We installed 8 canister lights. 4 in the flat part, two in each side of the angled parts. We didn't finish sheeting the North and South parts in the top of the gable since we got tired of working in the crampt space. We then cleaned up inside the house bit since it was a mess with window and house wrap junk. Bryon came and visited for a while and then Dad showed up. Dad and I started cleaning the house in more detail while Matt went to get the trencher for his house. He cut the phone line for the neighbors so they had to fix that. While Dad was helping fixing the phone lines, I worked on running the circuit for the outlets in the back bedroom. Dad came over and we ran the power leads for the lights in the utility room\bathroom\back bedroom. We still need to put the ceiling fans, cans and other lights in the right places. Tomorrow Matt and I will continue working in this part of the house and get sheetrock blocks and all the electrical work done and then start moving through the house in areas. The shingles didn't show up until about 5ish and only worked a couple hours since it started blowing really hard. I'll have to ask Tom tomorrow what is going on. |