The first 8 pictures show what we did yesterday. The
remaining pictures show todays work. Today we started at 8:00 AM. Matt and I Started putting on the first three rows of OSB on the roof of the East side of the house. Once we got that done, we started putting on the grill truss (picture) P5221080). We tied it onto the forklift and lifted it up. It was a pain to get on. We then spent quite a bit of time getting it put on so that it didn't dip in at all. At this point, it was lunch time, so we took Kelly Anderson (She came to clean up and water my trees) to lunch. We also put the caps on the very top of the trusses. Once the caps were on, we spent some more time on the grill truss and then put the remaining OSB on the roof, marked it, and cut it off so the angle was right on the hip. We then started on the jut out on the master bedroom, we didn't much done since another rain storm was on the way, so we quit at 7:00pm or so. |