Friday - 5-21-04

Today Matt, Dad and I finished cutting and installing the facia board on the East side of the house, all along the front that needed it, the East side of the garage, as well as the West side of the house.  Everything is extremely straight, and we one had to cut the face of two trusses to get the facia to line up correctly.

Once we were done with that, we put the extension forks on the forklift, chained the 14' cage on the forklift and loaded up with 5/8 OSB and using halogen lights we installed the roof on the West side of the garage.

No pictures of my house today, it was too dark, but here are some pictures of Matts house.  The brick layers finished up the front today, and now they just need to brick the pillars in the back for the deck.

 

P5211064.JPG
P5211064.JPG
(761KB)
P5211065.JPG
P5211065.JPG
(748KB)
P5211066.JPG
P5211066.JPG
(856KB)
P5211067.JPG
P5211067.JPG
(774KB)
P5211068.JPG
P5211068.JPG
(828KB)
P5211069.JPG
P5211069.JPG
(823KB)
P5211070.JPG
P5211070.JPG
(815KB)
P5211071.JPG
P5211071.JPG
(802KB)