Today at 3:30 the truss guys came down and measured
everything . They showed up right at 3:30 and were there about an
hour. They said that my trusses would probably be delivered next
Tuesday. They should be pretty sweet. We are putting a gabled
roof in the covered patio trusses among other things. Matt and I then prepared the garage so we can pour concrete later this week. We used the backhoe to dig it down and then did a ton of shoveling by hand. We have it to about the right level with 4 inches of slope from one end to the other. In the Winter I will be able to wash the car in the garage with hot and cold running water and have it all run out of the garage. |