Monday 5-03-04

Today at 3:30 the truss guys came down and measured everything .  They showed up right at 3:30 and were there about an hour.  They said that my trusses would probably be delivered next Tuesday.  They should be pretty sweet.  We are putting a gabled roof in the covered patio trusses among other things.

Matt and I then prepared the garage so we can pour concrete later this week.  We used the backhoe to dig it down and then did a ton of shoveling by hand.  We have it to about the right level with 4 inches of slope from one end to the other.  In the Winter I will be able to wash the car in the garage with hot and cold running water and have it all run out of the garage.