After work I went to the electric company to talk to them
about getting service installed. They will come look at things on
Monday. Dad, Matt and I finished putting on all the flooring and Matt laid out the top and bottom plates for the South wall. Tomorrow I will build the wall until Grandpa gets here to help lay out some of the walls. I had 11 sheets of flooring left over ($30 each) on top of the 10 or so sheets of CDX at 30 bucks each left over. I'll either use them someplace or sell them to John for his house. Oh, when I took the pictures, the first three show last nights and Mondays work, and the last three show tonight's work. I had the camera set wrong, so they are darker than they should be. |
P4230758.JPG (733KB) |
P4230759.JPG (743KB) |
P4230760.JPG (714KB) |
P4230761.JPG (779KB) |
P4230763.JPG (726KB) |