4-6-04
No pictures today. Dan did his inspection and passed everything. I spent from 4:30 to 6:30 shoving dirt up against the forms, re-checking all the forms to make sure they were still at the correct elevation and found some that were wrong. Dad and I spent from 9:30 until 10:30 fixing the forms that were wrong, and double checking everything else. I also measured every 5 feet to find the average depth of the forms. 9.3 inches deep x 454 feet long x 16 inches wide = 18.3 yards of concrete to order. |