Today the clock people called, and they are going to drop
ship me a replacement clock. I can't remember if I mentioned this
earlier, but I ordered a 31 inch clock for the living room. When I got to the house I put a coat of paint on the primed parts of the molding in the Master Bathroom. After that, I went upstairs and sanded the molding in the game room, and then vacuumed the entire upstairs so I could do some painting. I put a coat on the doorway trim going into the theater, and all the molding on the floor in the game room. After that was done, I went into the computer room and caulked along the top of the chair rail so it would look better. After that, I hauled up some molding to finish the game room when we get the doorway finished. I sanded it down really good and put a coat of paint on it. I then went and worked on the shelf some more. I got it cut to length and routered, then put the decorative stuff on it and glued and nailed it on with the pin nailer. I then went back upstairs and put a second coat on the molding that was laying on the floor to use later and in the Master Bathroom, I put a second coat of paint on all the stuff that was only primed.
|