Today I went to church since I have been skipping the last
three weeks, and then afterward had dinner at home with mom\dad\emily\kelly\lex
and maci. I got to the house around 2ish or so and cleaned all the crap out of the bed of the truck, washed it out and scrubbed it with a broom and disk soap. Then I started doing the base molding in the Master Bathroom. Before I could start I had to put the kick plate on the cabinets. I used the oak backsplash from upstairs since dad stained it the wrong color. Once I got that on, started the molding. I used the molding that I painted the other day but ran out so I have once piece on the West wall that will need to be painted. I had to cut one piece to go over the kick plate and one piece I had to trim a bit to fit under the cabinets. I got it all on and the corners glued. Tomorrow after the glue is dry I will sand them down really good and prime and paint the corners. I caulked the trim and then caulked the trim in the bedroom. After that, I put the blinds up and then put the pull knobs on the cabinets. I filled the the whirlpool and plugged in the pump and fired it up to see how it worked. It works good :) I took pictures of Matts theater, see his pictures on the main page. |