Wednesday 10-27-04

Today after work I went to Ace and got some more masking paper.

I got to the house and screwed the mail box to the stand and hauled it out to the road.  With a 5 gallon bucket of concrete, that sucker was heavy.

I then took the masking off most of what we sprayed yesterday and moved it to the dining room sliding glass door, and the pantry door.

I primed the window frames in the master bathroom, primed the master bathroom door frame, primed the family room sliding door frame, the pantry door frame, the kitchen entry way frame, and the back bedroom window frame.

I also sanded most of the molding in the family room and primed the arch, and sanded the window frames in the master bathroom and primed the arch in there as well.

I also caulked most of the stuff that was primed today as well.

Tomorrow is parent-teacher conference. 

 

PA270002.JPG
PA270002.JPG
(836KB)
PA270003.JPG
PA270003.JPG
(854KB)
PA270004.JPG
PA270004.JPG
(791KB)
PA270005.JPG
PA270005.JPG
(841KB)
PA270006.JPG
PA270006.JPG
(819KB)
PA270007.JPG
PA270007.JPG
(821KB)
PA270008.JPG
PA270008.JPG
(836KB)
PA270009.JPG
PA270009.JPG
(793KB)
PA270010.JPG
PA270010.JPG
(849KB)
PA270011.JPG
PA270011.JPG
(809KB)
PA270012.JPG
PA270012.JPG
(843KB)
PA270013.JPG
PA270013.JPG
(808KB)
PA270014.JPG
PA270014.JPG
(820KB)
PA270015.JPG
PA270015.JPG
(824KB)
PA270016.JPG
PA270016.JPG
(791KB)
PA270017.JPG
PA270017.JPG
(829KB)
PA270018.JPG
PA270018.JPG
(836KB)
PA270019.JPG
PA270019.JPG
(860KB)
PA270020.JPG
PA270020.JPG
(820KB)
PA270021.JPG
PA270021.JPG
(790KB)