Today after work I went to the house and made my mail box
stand. I took a 5 gallon bucket, a piece of 4x4 pressure treated and
120 lbs of concrete and mixed the concrete, cut the 4x4 and put it all
together in a 5 gallon buck and walla, I have a mailbox stand. Cliff didn't show up so I went to Ace and bought some tape and masking paper and started masking the master bathroom windows, family room, the kitchen entry way and the back bedroom window so Matt could texture them. Cliff showed up and measured the carpet. He will call on Thursday to let me know the price and when it will show up. I then caulked pretty much all the doors downstairs. My finger is slightly sore. I also primed all the door frames down stairs. I then caulked the trim up on the wall in the entry way and around my decorative thingy between the ceiling and the light. I then painted the master bathroom door with its second coat and touched up the closet door under the stairs in a couple small spots. Matt then showed up about 9:30 and we textured everything I masked off. |