Monday 10-25-04

I called Cliff and arranged to meet him after work to figure out carpet.  He will come over tomorrow to do the final measuring.  Carpet is tentatively planned to be installed on the 15th of November so that will give me three weekends to get everything finished.

I sanded the trim on the South wall in the family room and dining room, sanded the trim on the pantry.

Matt put the oak trim on the stair way and put the last piece of base trim under the stairs.

I then painted the master bathroom door with a coat of paint, put a final coat on the door under the stairs.

I also primed the door frame going into the master bedroom and the two walk in closet doors in the master bedroom.