Today after work I started working on cutting the tile to
go around the toilet drains and the bathtubs. It took about 4 hours to get everything cut. The cuts in front of the bathtubs took the longest. I forgot to take a picture of the tile around the toilet in the main bath. Dad put the osb on the face of the steps going upstairs. Matt worked on the door to the attic in his Master Bedroom. |