Wednesday 10-06-04

Yesterday we laquered the oak trim on the counter tops and we worked on the plywood top on the whirlpool.

Today after work Matt, Dad and I worked on putting the tile in the two bathrooms.

It took about 3 hours to do the tile in the Master Bathroom and about 45 minutes to do the other bathroom.

We left out the tile on the front of the bathtubs and around the toilet drains since those are going to take a long time to cut out perfectly so I will do that Friday when the mortar is dry and we can take our time.

 