Saturday 9-24-04

Today after work I got to the house and found out that Rod cannot come today to measure for the arched moldings.  He will try and come tomorrow.

Dad and I used Johns backhoe and put pea gravel in the patio forms and then back filled them with dirt.  I will need to smooth out the dirt more later.

We then worked on the weather stripping around the garage doors.

After dinner Matt, dad and I got started on more trim work.  We trimmed out the sliding door in the family room and put the trim around it.  We finished the top of the window and the bottom and the top of the sliding door in the utility room.  We put the top on the pantry door and the entry way going into the hall from the kitchen.

We then put the trim on the sides of the entertainment center as well as the South book shelf.

By this time it was time to go home.

 

P9240062.JPG
P9240062.JPG
(785KB)
P9240063.JPG
P9240063.JPG
(829KB)
P9240064.JPG
P9240064.JPG
(806KB)
P9240065.JPG
P9240065.JPG
(870KB)
P9240066.JPG
P9240066.JPG
(821KB)
P9240067.JPG
P9240067.JPG
(872KB)
P9240068.JPG
P9240068.JPG
(835KB)
P9240069.JPG
P9240069.JPG
(809KB)
P9240070.JPG
P9240070.JPG
(809KB)
P9240071.JPG
P9240071.JPG
(829KB)
P9240072.JPG
P9240072.JPG
(870KB)
P9240073.JPG
P9240073.JPG
(815KB)
P9240074.JPG
P9240074.JPG
(804KB)
P9240075.JPG
P9240075.JPG
(815KB)
P9240076.JPG
P9240076.JPG
(831KB)
P9240077.JPG
P9240077.JPG
(830KB)
P9240078.JPG
P9240078.JPG
(842KB)
P9240079.JPG
P9240079.JPG
(791KB)