Today after work I went to Franklin and got some stain
pigment and some foam brushes. I got to the house and Jeff had finished things in the utility room and I have water outside! I hooked up all my hoses and strung them across Cades backyard and am currently letting the well run to clean out the sand. Matt and I started working on the casing for the Dining Room door. We got it built then built the frame for the family room window. I then drilled holes in the oak window sills for the back bedroom and Master Bathroom and got them screwed down. We then made the keystones for above the windows and doors. We then went into the Master Bedroom and put the trim on the window except for the arched stuff which I still need to order. Dad got the back hoe fixed and cut out the two electrical boxes in the bathroom that were covered up. You can also see pictures of the work over the last few days. |