Monday 8-30-04
This morning I called John and ordered 10 yards of pea
gravel for the driveway to build it up. I got off work and got to the house, got the truck and went and bought 20 sticks of rebar. I got back to the house and dad started moving the gravel into the driveway. We smoothed it out and got the depth correct. I put the front on the forms and staked it down more along with putting in the rebar. We checked the slope and found that the inside needs adjusted down a bit in two spots. We were planning on pouring tomorrow, but we will postpone it until Wednesday. In between me getting to the house, and me putting the final touches on things, dad worked in the garage on the taping. |