Tuesday 8-10-04

This morning I scrubbed the tile in the utility room and cleaned the joints so we could grout it.  We decided to use gray instead of white grout so I will have to get some.

Matt started painting along the edges in the master bathroom.  I cleaned up a bit as he was painting and once he had enough done I hung the lights above the sink and the sconces.  I also drilled holes in the cans and put the trims in place.  I also put the trims in the master bedroom, the hall way, the family room and part of the dining room.

We then grouted the entry way and cleaned up.  After that, Matt had to leave and I started putting the switches in the master bathroom along with the outlets.

Dad showed up and worked on the outlets in the dining room and kitchen.  He also got the heater and thermostat installed in there.  He put the thermostat in the family room and we fixed the gfci in the entry way.

I also put the screens in the sliding doors, adjusted them and put the latch on them.

 

P8100016.JPG
P8100016.JPG
(785KB)
P8100017.JPG
P8100017.JPG
(824KB)
P8100018.JPG
P8100018.JPG
(831KB)
P8100019.JPG
P8100019.JPG
(815KB)
P8100020.JPG
P8100020.JPG
(844KB)
P8100021.JPG
P8100021.JPG
(769KB)
P8100022.JPG
P8100022.JPG
(869KB)
P8100023.JPG
P8100023.JPG
(879KB)
P8100024.JPG
P8100024.JPG
(807KB)
P8100025.JPG
P8100025.JPG
(786KB)
P8100026.JPG
P8100026.JPG
(851KB)
P8100027.JPG
P8100027.JPG
(838KB)
P8100028.JPG
P8100028.JPG
(807KB)
P8100029.JPG
P8100029.JPG
(798KB)
P8100030.JPG
P8100030.JPG
(796KB)
P8100031.JPG
P8100031.JPG
(836KB)
P8100032.JPG
P8100032.JPG
(839KB)
P8100033.JPG
P8100033.JPG
(839KB)
P8100034.JPG
P8100034.JPG
(798KB)
P8100035.JPG
P8100035.JPG
(819KB)