This morning I trimmed the ceiling in the main floor where
the paint was a little thin where the ceiling met the walls. Lexy
helped me for a while as well. Franklin delivered my backer board so I started working on that. I ran out and had to have dad get me some more. I finished around 8:00pm. Putting this down is not hard, but takes forever because each backer board requires a TON of screws and they are $23 for each 5 lb box. I used two boxes. The appraiser came over to look at the house today. Tomorrow I will do some double checking and lay some tile out, then after lunch Matt and I will start putting it in. |
![]() P8030048.JPG (859KB) |
![]() P8030049.JPG (885KB) |
![]() P8030050.JPG (867KB) |
![]() P8030051.JPG (784KB) |
![]() P8030052.JPG (850KB) |
![]() P8030053.JPG (800KB) |
![]() P8030054.JPG (810KB) |
![]() P8030055.JPG (803KB) |