Tuesday 7-06-04

This morning I went to Ace Hardware to get another electrical box for the stove then headed to the house.  Matt got there and we got a list of stuff to get so I ran into Franklin and got some more studs, 10 sheets of 7/16 osb and some masonite.  I then went to Columbia Electric and got three more cans and then Pacific Recycling and got two more angle irons.

When I got to the house Matt was working on the arch cieling.  We found that one arch was off a bit so we fixed that by adding another piece of mdf to it.

I hung the remaining can and ran the wiring to it.  I relocated the smoke detector and put in the light in the hall.  While I was doing this, Matt put the steel in upstairs.

We then cleaned the house in wait of the sheetrock which didn't show up until close to 5:30ish.  It took them nearly two hours to unload and I gave the two guys a $20 tip each for the hard work.

Dad and I then put in some boards in the attic for a walkway so I can get around up there without tromping through insulation.

Oh, my front door came today as well.  Pictures are below.

 

P7062348.JPG
P7062348.JPG
(829KB)
P7062349.JPG
P7062349.JPG
(845KB)
P7062350.JPG
P7062350.JPG
(803KB)
P7062351.JPG
P7062351.JPG
(783KB)
P7062352.JPG
P7062352.JPG
(847KB)
P7062353.JPG
P7062353.JPG
(898KB)
P7062354.JPG
P7062354.JPG
(878KB)
P7062355.JPG
P7062355.JPG
(812KB)
P7062356.JPG
P7062356.JPG
(810KB)
P7062357.JPG
P7062357.JPG
(894KB)
P7062358.JPG
P7062358.JPG
(850KB)
P7062359.JPG
P7062359.JPG
(833KB)
P7062360.JPG
P7062360.JPG
(805KB)
P7062361.JPG
P7062361.JPG
(831KB)
P7062362.JPG
P7062362.JPG
(836KB)
P7062363.jpg
P7062363.jpg
(863KB)
P7062364.JPG
P7062364.JPG
(835KB)
P7062365.JPG
P7062365.JPG
(848KB)
p7062366.jpg
p7062366.jpg
(859KB)
P7062367.JPG
P7062367.JPG
(834KB)
P7062368.JPG
P7062368.JPG
(806KB)
p7062369.jpg
p7062369.jpg
(810KB)
P7062370.JPG
P7062370.JPG
(807KB)
P7062371.JPG
P7062371.JPG
(820KB)
P7062372.JPG
P7062372.JPG
(806KB)

This page was generated by an unregistered version of Pink Mouse's Image Organiser