Today was a big day. I got out to the house at about 6:30am and moved all the stuff on the West side of my property so the excavators could dig the water line from the well to the house and out to the water spigots. I also cleaned up a bit more in the house. Matt got out about 8:00ish, and we started working on steel in some more walls. Jeff showed up with the drain field stuff and while we waited for the excavator we fixed Matts leaking spigot. The excavator showed up and they started work and we went back in and continued with steel. We pretty much stayed out of their way and pictures are lacking because of it, but we had stuff to do. The insulators showed up about 11:00am and they got to work. Matt and I kept busy with other stuff. After lunch Scott Arnell, the health district inspector came out and looked at the septic tank and drain field and said to go ahead and bury it. Jeff came by later and did so. I was busy putting in the air conditioning duct work in the comp\game\home theater rooms and got it finished. The insulators started having problems when their hoses started having trouble. They would either break, or keep popping off. We went to Ace Hardware and jerry rigged a solution but it didn't last long, they left at about 6:30 to go home and will be back tomorrow. |
This page was generated by an unregistered version of Pink Mouse's Image Organiser